Due to the high speed of assembly of the load-bearing frame of the SOYUZ SmartScaff series scaffolding, hey are irreplaceable when holding cultural and show events, especially in large cities, when the time for installation of structures is extremely limited and literally minutes count.
The assembly speed of our scaffolding allows us to increase the turnover of the material and carry out more activities in one unit of time.
Thanks to the system robustness and flexibility, you can turn even the wildest ideas into reality, from stages for large-scale music festivals to cozy designs for local performances.
An additional feature in show events and actions is a clear date for its holding, which cannot be postponed or delayed. Our customers can rely on the delivery of SOYUZ scaffolding on time due to the large stock of scaffolding elements in the warehouse (from 1,000 tons), as well as extensive accumulated experience (including international experience) directly in the supply and installation of spectator arenas and tribunes since 2004.
Technical data
|
Span length / width |
0.25–7 m |
|
Structure height |
50 m (calculation and design is required) |
|
Load |
200, 300, 450, 600 kg/m² |
We are ready to answer all your questions, call us or leave a number and we will call you back.