During construction and reconstruction, there is often a need for temporary prefabricated bridges and overpasses to bypass obstacles in the form of pits, roads, various utilities and other structures.
The advantage of SOYUZ scaffolding is that 100% standard scaffolding elements are needed to assemble bridges and overpasses, which you can use, for example, for conventional facade scaffolding or scaffold towers.
The spans of bridges and overpasses can reach 20 meters or more, and both vehicles and personnel can move along them due to the high load-bearing capacity of the elements.
Installation can be done on the ground and then the finished bridge span can be placed in the design position using a crane (enlarged assembly).
Also, prefabricated bridge structures made from scaffolding are often used during the reconstruction/restoration of stationary bridges and crossings as a backup.
Technical data
|
Bridge span length |
20 m (calculation and design is required) |
|
Load |
200 kg/m², 300 kg/m², 450 kg/m², 600 kg/m² |
We are ready to answer all your questions, call us or leave a number and we will call you back.