During construction and reconstruction, there is often a need for temporary prefabricated bridges and overpasses for laying utilities along them to bypass obstacles in the form of pits, roads, and other structures.
The advantage of SOYUZ scaffolding is that 100% standard scaffolding elements are used to assemble bridges and overpasses, which you can use, for example, for suspended or supporting scaffolding.
The spans of bridges and overpasses can reach 20 meters or more, and both light cables and heavy pipes can be laid along them due to the high load-bearing capacity of the SOYUZ scaffolding elements.
Installation can be done on the ground and then the finished bridge span can be placed in the design position using a crane (enlarged assembly).
Obstacles can be avoided as an "easy" solution using ready-made lattice girders, or by constructing a full-fledged bridge, the choice of solution depends on the loads, span and needs of the client.
Technical data
|
Flyover span length |
20 m (calculation and design is required) |
|
Load |
200 kg/m², 300 kg/m², 450 kg/m², 600 kg/m² |
We are ready to answer all your questions, call us or leave a number and we will call you back.