Flyovers for utilities

01

Description

During construction and reconstruction, temporary prefabricated demountable bridges and flyovers are often needed in order to lay utilities over them and to bypass obstacles, such as pits, roads, and other structures. An advantage of «SOYUZ» scaffolding is that assembly of bridges and flyovers use 100%-standard scaffold members, which you can use, for instance, for suspended or supported scaffolding. Spans of bridges and flyovers can reach 20 metres or more. Both light cables and heavy pipes can be laid over them due to the high load-carrying capacity of «SOYUZ» scaffolding members. Installation can be carried out on the ground, and then the finished bridge span can be put into the design position using a crane (preassembly). Obstacle avoidance can be implemented either with an «easy» solution using trusses or by building a fully-fledged bridge—selection of the solution depends on loads, the span, and the customer’s needs.

02

Technical characteristics

Length of the flyover span: 20 metres (calculation and a design are required)

Load: 200/300/450/600 kg/m²